Originally Posted by
pitchattitude
More specifics required. Initial, after a bid? Returning after LOA? Bid gives a time frame for training. Flow plan comes out within a few days of the bid with projected dates.
For LT upgrade. Flowplan says next month. Nothing in HI10 as of yet. Thought they had to schedule me before July bids open up?