Originally Posted by
Slow2Final
Hah. 0 chance that would be possible without SAP.
It would be possible, and even likely, if trip and duty rigs, as well as a real min day were implemented. Those would either fix most of the schedule-building issues, or the pilot group would be compensated adequately any time the company felt the need to build 12 hour 4-days.