Originally Posted by
David Puddy
It’s a game changer for the network planning guys... Imagine what Spirit could do with it.
Oh I can imagine 3 round trips FLL TPA a day. Or 4 day pairings with 18 legs. Or never flying longer than 500 miles.
And it takes time and brainpower to bring a new frame on property. Proving runs, LCA program, mx program etc etc. These guys can’t get the scheduling phones manned or anticipate known summer weather patterns, I think they’d have their hands full getting a new frame here.
My bet is they’ll keep adding 320’s 3-5 at a time.