Originally Posted by
JMO127
16-18 days in PSM, then another 7 in Dallas for a 12 is a bit much. I personally think PSI, GA, RT should have used the 3M and put that towards their own Level D PC 12 Sim. 3M only gets you a quarter of the way, but huge savings with training, travel, etc.
It’s a nice thought, but the mission fit is dirt cheap to operate compared to a Level D sim. Initial cost is high, but it works how it is intended to work and has lower recurring costs.
I doubt that “careers were ruined” as a result of using the mission fit. The mission fit does not substitute any portion of the checkride; it shouldn’t be reported in a PRIA request by a future air carrier.
Sent from my iPhone using Tapatalk