Thread: Planesense
View Single Post
Old 08-16-2019 | 04:04 AM
  #2130  
Toonces
Gets Weekends Off
 
Joined: Aug 2013
Posts: 627
Likes: 0
From: FO
Default

Originally Posted by JMO127
16-18 days in PSM, then another 7 in Dallas for a 12 is a bit much. I personally think PSI, GA, RT should have used the 3M and put that towards their own Level D PC 12 Sim. 3M only gets you a quarter of the way, but huge savings with training, travel, etc.

It’s a nice thought, but the mission fit is dirt cheap to operate compared to a Level D sim. Initial cost is high, but it works how it is intended to work and has lower recurring costs.

I doubt that “careers were ruined” as a result of using the mission fit. The mission fit does not substitute any portion of the checkride; it shouldn’t be reported in a PRIA request by a future air carrier.


Sent from my iPhone using Tapatalk
Reply