Maybe they'll be a little more apt to get the electromechanical gustlocks installed much sooner. The ones without that are the only aircraft affected by the SB.
Makes sense. The electromecanical locks the elevator. The other one locks the yoke and you have fifty-something feet of cables getting tensioned and slacked as the elevator flops around.