Originally Posted by
Excargodog
The issue is ramp space. They have been turning these out like the sorcerer’s apprentice, and have filled up available ramp space and even overflowed into employee parking lots at the factory.
They are getting gridlocked with produced but undeliverable aircraft.
https://youtu.be/hwejf6Yb3tA
How about hooking them all together on the power grid and competing with PG&E?