View Single Post
Old 01-20-2020, 11:27 AM
  #215  
THE SHAFT
Line Holder
 
Joined APC: Feb 2015
Position: Back of the Bus
Posts: 87
Default

The sim and building in Burlingame were renewed for another 4-5 years. All legacy airbus training management has been forced out. That to me is further indication that they are simply limping the frame along till their lease obligations expire. In the mean time trying to use the dual fleet as a bargaining chip against both the manufacturers and labor group. I’m sure that the hotel rates at the Interurban and Hilton are far cheaper then opening up a base. In the meantime we can enjoy multi day trips with extended sits. Fortunately for us we are not contractual obligated to be contactable while away from base. No favors no waivers fly the contract.
THE SHAFT is offline