Originally Posted by
APC225
Aside from buffoonery, it’s the silos too. They could have 10 reserves but since you’re the only one in your silo, they can create a “two day SC" even though no SC is actually two days long, and give it to you because you’re the only one in a two-day silo. The fix is to get rid of the silos, and all SC/FS are for one day (since they are really only for one day anyway), then FIFO would be for very reserve in the pool, not just your silo. It would prevent this practice of them looking at the silos and then creating a reserve assignment designed only for you.
Okay, have zero idea what I’m talking about here......just work the PDR Hotline.
Yes, CM has too much freedom with how/when they build SC and FSB. That said, SC often overlaps 2 calendar days.
The freedom they have is in that contract thing. Sucks but is.
Lee
PS, don’t like it either