Originally Posted by
Viperstick
The longer TK is operating at full capacity, the faster the company can cut to the bone. The "snapback" date will coincide with when TK will be caught up. I'm predicting Aug 31st, 2021 for the MOAF (Mother of All Furloughs).
Your logic makes zero sense, when the AIP comes out according to the rumors it should contain cancelling all displacements. So if the company was buying time to do a MOAF, wouldn’t it make sense to keep all displacements in place instead of cancelling them? Drop the m@sturbation furlough soap and think straight.