Originally Posted by
Falcon20
I checked and it was for trips beyond 8 hours so I think it should have only been 1 person per trip. I’ll call scheduling in a few and see what they say.
According to DALPA, the list on ARCOS is not the same as the batch size used by Scheduling. The only way to ascertain what the batch size was is to call Scheduling and ask.