Originally Posted by
Gspeed
According to DALPA, the list on ARCOS is not the same as the batch size used by Scheduling. The only way to ascertain what the batch size was is to call Scheduling and ask.
... but if the trip was reporting in more than 8 hours, and he didn’t get any trip that he was called for, by definition the batch size was greater than 1:1, right?