View Single Post
Old 01-17-2021 | 07:47 AM
  #10407  
TristarJS30
Permanent Ready Reserve
 
Joined: Mar 2006
Posts: 969
Likes: 0
From: Upright and Locked
Default

Originally Posted by Rabid Seagull
Like others have said, it's a silo D assignment. Curious how you were "moved" to SCD, post DRO? Day 1? Company CAN change the next day assignment with you acknowledging JetCrew/ positive contact, I have never seen that , pre or post CBA.

The DRO was wrong on Friday for a fellow RSV, assigning silos out of seniority. I'm sure that CA called to correct it and they changed his RAP ( reflected in Flica, but obviously not in the DRO)

The "SCD Tally" column is just that, max 6 SCD in a bid period unless you like that kind of stuff and/ or have friends in SDQ.
I prefer early AM and bid the A silo all week. Day 1 was 4am, Day 2 was 11a, 3 was 7am (and that was the one that was listed as SCD). Like someone above said, it was probably a mistake in scheduling.
Reply