View Single Post
Old 05-28-2021 | 03:14 AM
  #955  
Trip7's Avatar
Trip7
Gets Weekends Off
 
Joined: Dec 2007
Posts: 6,145
Likes: 204
Default

Here's where the discussion needs to center:

Exception two: In the event the hiring or flow provisions of NWA LOA 2006-10 or LOA #9 cease to be available, either at the feeder carrier affiliate referenced in such LOAs or at another carrier, the number of permitted 76-seat aircraft in Section 1 B. 5 47. e. will be reduced by 35.

Does "at another carrier" mean Delta can cut and paste any other carrier into the current LOA or does a new LOA need to be produced for said "other carrier"

IMO(non lawyer) since Delta Management negotiated a completely different flow deal with Endeavor's MEC and simply didn't cut and paste the LOA #9 language a completely new LOA with the Delta MEC has to be agreed upon to satisfy Exception two

Sent from my SM-N986U using Tapatalk
Reply