Thread: SkyWest ?’s
View Single Post
Old 06-09-2021 | 05:24 AM
  #2004  
R0GER BALL
Line Holder
 
Joined: Dec 2019
Posts: 589
Likes: 30
Default

Originally Posted by KirillTheThrill
My response was implying that’s barely the actual reason. I read the RSR report from DP. E175 flying shifts to SLC and SLC 900 flying shifts to MSP. I most certainly didn’t miss the part where he stated it’s expected to continue through the summer and MIGHT end in the fall. Delta calls the shots on what A/C they desire us to fly out each domicile. The company is just responding accordingly. I’m not worried about it, but I will be if business travel out of MSP doesn’t start coming back, or construction takes longer than normal around the G gates, which is the actual reason the E175 block hours disappeared. We don’t own those C gates, Delta does, and it appears they decided the mainline jets will be operated out of them until at least the fall.
Sorry. Great points.
As a fellow cynic you’d think I’d have got that.
Reply