Originally Posted by
BeatNavy
Sounds like E190 training capacity will be increased by using CAE sims in Dallas soon.
Interesting. That is the biggest problem right now. If they can increase 190 sim time by a third or more it would be huge for the amount they can push through the entire training system.
Sent from my iPad using Tapatalk