Originally Posted by
AirbusPTC
However, I'll bet if the company did a "look-back" audit of how many of those trips actually had to be broken up to be covered it would turn out to be more expensive to cover the longer trips.
This. I will make the same bet. Chasing credit works with adequate staffing levels, but anyone can see that the schedule is held together with duct tape and baling wire while we are short staffed.