Originally Posted by
CincoDeMayo
Yeah, X/Y is a NK thing, one is basically a short call “can you get here now for 200%” (Y) and the other (X) is usually a “we have a trip tomorrow for 200%”. A lot of guys drop their schedules down, list for these lists, and wait by the phone.
I can imagine a 150% on top of a 125% works out well. At that point, it’s darn close to 200% on the hourly rate.
Is it first come first serve or by seniority? If it’s seniority, it sounds a little like our old VJA system but they didn’t split it up by timeframe. It was usually all “get there now” type stuff before going up the junior assignment list.