View Single Post
Old 03-02-2008 | 08:40 AM
  #31  
Spooled
Gets Weekends Off
 
Joined: Dec 2007
Posts: 359
Likes: 0
Default

Originally Posted by cosmosdrvr
Is the upgrade still pretty quick for those with the flt time?

What is the junior base?

I have about 2000 hrs sic in the crj.
DTW is junior. MSP is going to be the hardest to hold because of Mesaba getting 17 planes that will be based in MSP. I would guess upgrade is 6 months.

Latest Captain Vacancy:

9 MEM

3 DTW

1 MSP

10 ATL
Reply