Thread: SkyWest ?’s
View Single Post
Old 11-16-2021 | 08:24 AM
  #2874  
DB12
On Reserve
 
Joined: Sep 2021
Posts: 24
Likes: 0
From: ERJ Captain
Default

Originally Posted by PossibleDeviation
New hire classes have been 60/40 heavier on the CRJ. If you want a certain plane I'm sure they'll give you the option.

No. You'll fly as much as you want on both fleets right now.

Upgrade is under 2 years on both fleets and it looks like in the near term that as soon as you hit your 1,000 SIC you'll be able to upgrade.
How much flying do you get a month as a new hire and how long is the reserve if you chose ERJ?
Reply