Thread: New Hire Thread
View Single Post
Old 01-17-2022 | 07:26 PM
  #773  
edv2021
Line Holder
 
Joined: Sep 2021
Posts: 73
Likes: 0
Default

Originally Posted by Milksheikh
the overlapping bases are at this point a toss up. (Dtw/msp). Upgrade is a lot quicker at skywest for the time being but it’s probably going to be similar for anyone starting in the next 6 months. Atl/nyc/cvg hands down endeavor.
Upgrade times are meaningless. Within the next 6-12 months, upgrade time is going to be “how long can it take you to get to 1000 121 hours?”
Reply