Originally Posted by
tennisguru
It's either full from the last AE, or training is full. Someone posted recently that the 717 had the longest wait for training after indoc, up to 8 weeks...
i think this is the answer. Based on the drops posted here there are still about 70 unfilled spots on the 717 between DTW and ATL. That number does not include positions offered to 9E flows (they bid separately) but I can’t imagine 70 717 positions went to endeavor flows.