View Single Post
Old 04-27-2022 | 04:11 AM
  #209  
Hawkerdriver1
FO
 
Joined: Apr 2015
Posts: 190
Likes: 0
From: B777
Default

Originally Posted by C17B74
Unsure how our Gateway system affects the special needs consideration but we do not “offer” home basing. Our Gateway system does not require an individual to rent a crash pad if that might be the issue. Gateway participant’s are ticketed to their base or departure airport for work and provided a hotel. If I am not mistaken, Kalitta has a 16 work day requirement and the first and last day travel days are inclusive being home based; whereas, our 17 work day requirement may not include your travel days and cost you a day or even more to pre-position and return home.

Apologies for any misunderstanding of the issue at hand other than being away even longer.
Thanks for your kind thoughts.

HD
Reply