Originally Posted by
bruhaha
Is this how to get two day back to back trips? We have to waive to zero to get trips assigned back to back? With 10 hrs off in base between trips.
I don’t want a three day trip with four days off and another two day trip.
i really want four days with 3 days off but since there are very few 4 day trips I imagine I have to get some combo of 3/1 2/2 or put up with 3/3 or 3/2
new bid group
waive
minimum days off to
3
apply
set condition
maximum days on in a row
4
apply
any other preference/condition/rule
award trips