View Single Post
Old 03-18-2008, 01:44 PM
  #9  
FDXer
Gets Weekends Off
 
Joined APC: Aug 2006
Position: MD-11 Captain
Posts: 1,395
Default

Number of R-24 lines should be 10% of the number of R-lines. The increase in R-24 is because there is an overall increase in the number of R lines.

25.D.3.e.

There shall be a minimum of 10% R-24 lines per bid pack,
with a minimum of one R-24 line (described in Section
25.M.2.). The Company and the SIG shall coordinate to
establish a percentage of R-24 lines by bid pack, and this
percentage shall be reevaluated on a quarterly basis.
FDXer is offline