Originally Posted by
Sputnik
SRH handbook and PBS help pages aren't getting me the answer I need so thought I'd try my luck with the APC crowd
There is a particular trip I want and the rest of that bid group is contigent on it. If I don't get that trip, I want to go to the next bid group. And for the life of me I can't figure out how to bid that.
In effect, I want "Award pairing number xxxx departing on July xx, xxxx; else start next bid group"
The first part is easy, but I can't figure out how to get the second part. Or the equivalent meaning.
Help?
THanks
You want to use Clear Schedule Start next. Just realize you need to put in a positive preference (award XX pairings) for all the other stuff you want as well. The CSSN is stopping short of the system generate "award pairing" line, so you can't just do negative bids (prefer off/avoid/etc...) and rely on the award pairings line. Check out the composite reports to see how others are doing it. Recommend a category that is heavy with former NWA pilots (MSP320A is probably a safe bet), they love them some CSSN.