Thread: Allegiant Bases
View Single Post
Old 08-24-2022 | 03:31 PM
  #638  
captnate702
Line Holder
 
Joined: Aug 2020
Posts: 957
Likes: 18
From: A320 CA
Default

Originally Posted by wilco811
I really can’t believe this place is going to do overnights out of 9 bases. Is that even possible for this place that can’t even get the pax count straight much of the time? It’ll be the meltdown of the century the minute they try it.
This right here^^^^

I’m sure management would love to do overnights and maximize pilot time, but they know that would result in a total meltdown. We can’t run a clean operation with the most dummy-proof schedule/network in the industry. Management knows that cancellations are killers and have bragged to walk street that delays are no big deal as long we don’t have cancellations. Multi day trips will cause a huge spike in cancellations.

The stuff I’m hearing is that MG and the general are still following Andrew around trying to whisper in his ear that we need to get a new contract soon. Also hearing that exco does not want to talk about money and pay scales until management agrees on arbitration rules. RLA pretty much tells you what the arbitration rules are so I’m not sure what this means, but that’s the snippet I’ve been told from ppl in the union and what Andrew has said in multiple videos. I’ve also heard the exco doesn’t want to pass pay scales until the United TA becomes public so we don’t get leapfrogged again.
Reply