Originally Posted by
Otterbox
Longer upgrades than Southwest?
C-c-c-c-c-combo breaker. He had all true and valid points and you interject with something like that? If anything upgrade times will drop given that a lot of low time pilots might not be at the 4K required hours when their number comes up.