View Single Post
Old 10-19-2022 | 01:55 PM
  #207  
Swapapotamoose
Line Holder
 
Joined: Jul 2021
Posts: 239
Likes: 5
Default

Originally Posted by stang
Some have. It's still building up with no idea what the plan is for how large. Bids are for 3 months in the future. So this Octobers vacancy bid is for base transfer effective Feb 1 for example.

Warning on all of this, MIA was being built up but now cut in 1/2 - so things are very dynamic at F9.
I heard AA was using their connections in the local government to have Dade county apply pressure on F9. Threatening to reduce slots because of F9’s performance. Total BS if it’s true.
Reply