Originally Posted by
FangsF15
This is absolutely not true. I “strand” a single day all the time. nene is correct.
What you may be thinking of is IF you have a single day of reserve on the last day of the prior bid period, AND you do not have an X day on the first day of the subsequent bid period, PBS will force compliance with the 3-99-5 or 4-99-4 rules. BUT, you absolutely can bid an x-day on the first after a single LC day on the 30th.
You are correct, I haven’t messed too much with that angle of the PWA.