Originally Posted by
HandFlyorDie
Anyone else notice that our “min calendar day” is not really min calendar day? It only goes toward ADG if not on hard block time. Great if they were abusing you on 3/4 days with a 30 hour but useless if you’re only at 18:30 block on a four day with a thirty hour layover.
That's actually the point of it, it's a trip construction rig to discourage such hard days around the 30 hr. A lot of these trip rigs are meant to improve schedule quality even with the optimizer.