View Single Post
Old 03-08-2023 | 06:18 PM
  #12  
TFAYD
Line Holder
 
Joined: Dec 2018
Posts: 1,150
Likes: 9
Default

Originally Posted by Sniper66
from AIP to TA
10 days at the most as the union said most verbiage is done
15 days review by the MEC and if they approve it ( as per policy manual )
30 days road shows if not less
then 15 to 20days voting period as it was with LOAs and extensions in the past ( min time required as per policy manual)

DOS will be 55 to 60 days after the AIP announced

my guess of course
Tumi’s are on back order for the next 5 months. That’s a no go item to get anything signed.
Reply