Originally Posted by
tanker
If you are being drawn to the 8/6 schedule have you considered NetJets or Plane Sense that have a 7/7 schedule?
Both great companies, Tanker..
l would love to see a 7/7 schedule be offered here! Until then, Pilots come to us because of quicker upgrades and being able to start right in a jet, vs. an awesome turboprop. With all my friends there, the only reason that I didn’t want to go to Netjets in 2018 was because of the then 10-15 year upgrade time. However, upgrade times there have dropped to 21 months!
It’s an amazing time to be a pilot.