Thread: Rumor mill
View Single Post
Old 03-20-2023 | 08:29 AM
  #38  
Mesabah
:-)
 
Joined: Feb 2007
Posts: 7,339
Likes: 0
Default

Originally Posted by PilotBases
Playing devils avocado. Couldn’t any LOA stapling endeavor also have the caveat of an equipment lock for a set period? Then you allow X per month to unlock. Those are all details that the folks sharper than me could figure out. Allow stapled guys to take an upgrade in the meantime on same equipment.
They would immediately be under the Delta PWA when stapled, so would the aircraft, so that would be a concession of several sections on our part. Contractually, they have to add the CRJs first under an AE for all current Delta pilots. Say there was an LOA locking those pilots, it creates a seniority inversion.
Reply