Thread: Survey accuracy
View Single Post
Old 07-07-2023 | 12:49 PM
  #44  
CincoDeMayo
That/It/Thang
 
Joined: Aug 2020
Posts: 3,500
Likes: 362
Default

Originally Posted by RiddleEagle18
The real beauty in the 4 days off min is that it forces the company to build more productive pairings if it wants to limit the number of pilots.

You can’t make a schedule of 5 hour min days(20 hour 4 days) and complete an entire summer month, with the typically higher bid divisor.
I’ll take a 4 leg 4 day at 20 hours before a 27 block 4 day
Reply