Originally Posted by
BlueMoon
At a 2nd MEM road show this was discussed.
it was said that The NC brought it to the MEC and the MEC shut it down since we had just had the realignment bid and people bid with one pay structure and thought it wouldn’t be fair to change it right after the bid.
Then why not make the effective date for this later in the future?