Thread: PBS at UAL
View Single Post
Old 01-30-2024 | 04:45 AM
  #19  
jdavk
line slug
 
Joined: Oct 2015
Posts: 360
Likes: 7
From: B787 Captain
Default

Originally Posted by C-17 Driver
I’m 6 from the bottom, so a line is highly unlikely.
Unlikely, yes, but not unheard of.

To the real point of my reply…

Originally Posted by C-17 Driver
What I do not like is that I had zero control or visibility of what a legal Reserve bid award would look like.


The contract spells out what a “legal” reserve bid award will look like.

If the combination of your current month’s schedule and the future (bid) month’s schedule don’t allow for a contractually legal reserve line to be built the BAT will fail every time.

(Of course, it’s possible that the BAT wasn’t working properly but, more often than not, failures like what you’ve described are caused by the schedule incompatibility between months.)
Reply