View Single Post
Old 05-26-2024 | 07:18 AM
  #40  
cencal83406
Line Holder
 
Joined: Jan 2008
Posts: 1,775
Likes: 18
Default

Originally Posted by notEnuf
I've looked at the 23.M.7. report a few times just to see how it's being reported. It seemed very short to me and I wondered how accurate it is and how can we really verify they are being done correctly? I am convinced the reporting requirement did very little. It comes down to each scheduler making an assignment to self report and there is no incentive to do that, probably a deterant to reporting if anything. I have no idea if "automating" it will catch it all when it comes down to the discretion of each individual scheduler. More intentional noncompliance in my opinion.
the other thing is that the *intent* is a big part of it.

for example building a reserve rotation out of base for the proper step but covering with a white slip would not be an M7.
Reply