View Single Post
Old 08-19-2025 | 04:20 PM
  #9  
Willsfdx
New Hire
 
Joined: Aug 2025
Posts: 1
Likes: 5
Default

What about the flex instructors working 28 days a month, some doing 2 events in a day? Last week when their calendars were temporarily unblocked from looking at their school house events the majority of them are getting over 90 hours a month whoring themselves out. I say open that section of the contract up and let the company have their way, I’m sick and tired of holding the line while these guys do this. These guys have always operated on their own, I don’t consider them part of the crew force when they’re doing things like that. LCAs are different but the flexes doing 90 to 100 hours a month is straight up wrong.
Reply