View Single Post
Old 09-21-2025 | 06:51 PM
  #36  
TimetoClimb
Line Holder
 
Joined: Jan 2016
Posts: 572
Likes: 6
Default

Originally Posted by PossibleDeviation
Yes. Every single SC I get is always a late build and then half go unused. So most of the time I end up with two hours add pay. Seems like the company loves this and very much willing to build late build SCs everyday. Pilot group came up very short with the pay triggers for the SCs. SCs should pay two hours regardless of used or unused and then five hours if they are late build. Almost impossible to sneak through a block of reserve days without getting converted which basically defeats the purpose of an 18 hour callout.
agreed, but if you’re getting all late build you are coming out ahead. Dunno how that would happen consistently, they generally build the first 3-5 scs between 9-10am at least that’s what I’ve seen. There is an occasional late build. There is also a provision if they give you one after it sat in open time for an hour or something to that effect
Reply