Thread: Contract 2026
View Single Post
Old 10-23-2025 | 03:04 PM
  #582  
Viper25's Avatar
Viper25
Line Holder
 
Joined: Jul 2008
Posts: 1,450
Likes: 293
Default

Originally Posted by tennisguru
I agree there are major issues. I've said in multiple posts that the company needs to be required to automate the TC process almost entirely. That alone should greatly cut down on all these last minute M7 IA's going out. And there will still always be stuff that pops up last minute, hence a new slip is needed that is time-limited, in seniority order, and no auto accept/ack.
These are great ideas. I hope surveys were sent to the NC that had these ideas.
Reply