View Single Post
Old 11-23-2025 | 04:30 PM
  #4391  
TheProfessor
On Reserve
 
Joined: May 2024
Posts: 45
Likes: 14
Default

Originally Posted by FangsF15
Nope, Has to start on the first day of a trip. IF you were to use 2 PB days on a trip, it would be on day 1 and 2.

This is why finding a high time day 1 is so important to maximize the pay for using a PB for pay. The Perfect trip would be a 1-day with 7-8 hours of block and a couple hours of EDP, for 9-10 hours pay for 1 PB day. But those trips go extremely fast on the swap board, so you have to be constantly checking when the schedules start to release.
Thank you, makes sense. For junior types such as myself who very rarely can ever touch a high time one day, is there a smarter way to burn PB days other than applying it to any day(s) above vacation value (or buying vacation days if you want the guaranteed time off)?
Reply