Thread: MOU 25-05
View Single Post
Old 12-12-2025 | 08:32 AM
  #1577  
notEnuf's Avatar
notEnuf
Racketeer
 
Joined: Mar 2015
Posts: 13,248
Likes: 707
From: N60.4858 W149.9327
Default

Originally Posted by Verdell
Are you suggesting that 23M7 is being triggered more often during the OOBWS step than during the WS step? Curious to see data to back this up.
I'd say yes. The volume of possible OBWS is much larger especially in smaller bases. The panic button is hit when scheduling thinks they can't get through them.
Reply