Old 02-23-2026 | 07:08 AM
  #11606  
Frank Grimes
Line Holder
 
Joined: Oct 2024
Posts: 295
Likes: 142
Default

Originally Posted by Verdell
I don't think he was putting out wrong information at all. If trip credits exist in a trip, overblocking WILL reduce those credits (except maybe MCD.) Block is always the first entry when calculating total pay for a trip, and credits come after.

Now if what you're getting at is delayed operations (which I wasn't talking about at least), that's a different (albeit related) animal.
That's not true. Read section 12 of the PWA. You have to know why you are getting credit for a trip. After completion of a rotation, a pilot will receive pay and credit for the greater of:
Rotation credit, or
The sum of the pilot's duty period credits, or
ADG, or
The sum of the pilot's DPMs, or
The sum, on a daily period basis, of the greater of:
A pilot's flight time, or
Minimum calendar day, or
The pay and credit determined at rotation construction

You have to know what each leg and each day is contributing and how it is contributing to the credit of the trip. Happy to eat crow if I'm wrong on this.
Reply