Originally Posted by
Verdell
Thanks. I was incorrect in what I said above.
But let's say you had 3 back-to-back 2-day trips over a 3-day footprint as I described above (like lean-overs, except with legal rest.). This would only take 3 IVD's and one occasion, yes?
I’ve never tried that scenario, but given the way the contract is worded it
should work. Whether the company has PCS programmed to handle it correctly is another matter.
Worst case, you could swap the trips for one long trip first, then drop it all with as little as 1 IVD day.