View Single Post
Old 04-05-2026 | 08:06 AM
  #5034  
notEnuf's Avatar
notEnuf
Racketeer
 
Joined: Mar 2015
Posts: 13,339
Likes: 828
From: N60.4858 W149.9327
Default

Originally Posted by Verdell
Another area that could use tightening in language. I don't believe the pre-release schedule check was ever intended to acknowledge an entire month of pre-posted rest assignments. It's so the RES pilot is obligated to go directly INTO rest for a subsequent assignment (same/next/second day) without having the him hawing of going back into LC and then being assigned rest.

Add to survey: "Post release schedule check requires the pilot to acknowledge same/next/second day assignments ONLY (including Rest on only those days.)"

This would go a long way towards solving the pre-posted rest problem. This and just making pre-posted rest only being same/next/second day assignable overall, just like EVERY other type of RES assignment.

This is the loophole the company found (the ability to make RES assignments beyond 2 days out)
~cough~ IVR(VRU) ~cough~
Reply