Originally Posted by
immolated
So if the plan was to ramp up hiring to cover the 100 jets we're getting, but we're already behind the curve and ramped up to maximum hiring, how's that going to play out?
my guess is these are a mix of growth and replacement airframes.
also, HK can correct me if I’m wrong, but I think an optimistic EIS is q4 2026. Still time to hire to catch up and cover deliveries.