Originally Posted by
subicpilot
My understanding is that the train is not an option, as public transportation of any kind is in violation of the CBA and LOA. The LOA would have to be modified to allow the train.
If we are going to change the LOA again lets get the invol STV eligibility window changed back from 1 every 6 bid periods (LOA) to 1 in 14 (contract). This will fix one of the most blantant stick it to the junior guy provisions (at least in the LOA).