Originally Posted by
texaspilot76
Is it that long? I heard that the Mesa Airways contract will expire the end of this year.
I sure hope that it is the latter. The sooner we can take over the 900 flying at PSA, the better. Expansion is what we need to get our furloughs back and resume upgrades.
Wow, really classy. I'm facing a furlough, and I wouldn't think of saying something like that.