View Single Post
Old 08-27-2008 | 10:26 AM
  #18  
gtechpilot
Gets Weekends Off
 
Joined: Aug 2008
Posts: 326
Likes: 0
Default

Originally Posted by sweptback
All the interesting stuff is redacted. Enjoy:

http://edgar.sec.gov/Archives/edgar/...042_1ex1d2.htm
Already read that - as stated, the juicy details are left out - for example:

ASA fails to maintain a completion rate of [***] with respect to the Delta Connection Flights during any [***] months during any consecutive [***] month period, unless Delta fails to maintain a completion rate of [***] with respect to its domestic mainline operations during the same [***] months as ASA’s failures during the same [***] period. For purposes of this Agreement, (a) Delta Connection Flights operated with no revenue passengers or completed over [***] hours late shall be considered as not completed and (b) Disproportionate ATL Cancellations shall be excluded from ASA’s completion rate calculation;
and

i) ASA shall be scheduled to operate not less than [***] of all Delta Connection Program departures scheduled at Hartsfield-Jackson Atlanta International Airport (“Hartsfield”) and (ii) [***] ((i) and (ii) above, collectively, the “ATL Departure Percentages.”)
Guess we just don't get to know for sure!
Reply