IMO: Of course they are on the "chopping" block. Everything is ALWAYS on the chopping block. The 767's were on the chopping block the day the deal was inked. This is UPS and multiple scenarios always rolling around their corporate ether. Remember the A300 order slashed, mixed with the A380 order? Everything that is a cost center is always being evaluated to cut costs. Doesn't mean this scenario has any real legs other than it is used in planning scenarios.